Evaluation Of Time And Cost Of Delay For Construction Implementation In The Biomoleculer Laboratory Building Project Btklpp Class I Makassar

Ashad, Hanafi (2020) Evaluation Of Time And Cost Of Delay For Construction Implementation In The Biomoleculer Laboratory Building Project Btklpp Class I Makassar. UNDERPASS: Journal of Civil Engineering, 4 (2). pp. 1-10. ISSN E-ISSN 2798-6500 P ISSN: 2597-4815

[img] Text
1.+Kasmawati+Kasmin.pdf

Download (498kB)
Item Type: Article
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: FAKULTAS TEKNIK > Teknik Sipil
Depositing User: Unnamed user with email admin@umi.ac.id
Date Deposited: 09 Feb 2023 01:49
Last Modified: 09 Feb 2023 01:49
URI: http://repository.umi.ac.id/id/eprint/1910

Actions (login required)

View Item View Item