Artikel

Feasibility study of salt industry and factor influencing the salt production in Pangkep

Abstrak

Abstract. This study aimed to investigate the dissemination level of U lil Filtered Technology (TUF) and geo-membrane technology and factors influencing salt production in Pangkep. Purposive sampling was perfor med for data collection. Regression analysis was applied for data analysis. Revenue cost analysis (R-C ratio) was performed. Break Event Point analysis (BEP) was applied , and Pay Back Period (PBP) analysis was used. The results showed that salt farmers u nfamiliar with TUF and geo- membrane technology ranged from 6.71 to 9.62%, reasonably k now (36.53 - 37.76%) and know to use TUF and geo-membrane technology (53.85 - 55 .53%). Cost and technology significantly affected salt production, inclu ding area and number of labourers. The business feasibility study showed that Reven ue Cost Ratio (1.98), Break Event Point (IDR 4,735,276), and Pay Back Period (1.9 years), respective ly

Dokumen

document.pdf
application/pdf · 404 KB
Lihat dokumen →
peer review.pdf
application/pdf · 461 KB
Lihat dokumen →
similarity (2).pdf
application/pdf · 672 KB
Lihat dokumen →
indexcodes.txt
text/plain · 5 KB
Lihat dokumen →
indexcodes.txt
text/plain · 0 KB
Lihat dokumen →

Lihat di Repository Asli